Ground screw and stem installations are almost complete after three long days in the Kansas summer heat and occasional rain. Remaining details to wrap up today (weather permitting) include plumbing stems, cropping the tops to a level datum and capping the stem/ground screw connection. Prairie grass landscaping will be installed soon with luminaire installation - the final crowning moment to the Pulse Field installation - scheduled for early September. The official public opening of Pulse Field and the new Wichita Art Museum Art Garden is September 26.